Project description

The facility of entrance roof overhang on the border crossing Dobrakovo is comprised of three structural units with roof dimensions in the bas 25.2x21.3 m +15.45 x 25.2 m + cantilever overhang 12.6 x 35.75 m.

The supporting roof structure of the facility is made of longitudinal roof flat truss girders of box sections, 27.40 m in span on the curved roof section, and 15.50 m with, on the flat roof section.

The natural lightning of the border crossing is performed by 6 light strips with lexan finishing. Sides, columns and main arch trusses are lined with aluminum composite panels. 

The management building is of G+1 number of floors. The facility is constructed of standard modular containers, 22 pieces total in two levels. The facility paneling is done with insulation panels. The distinctiveness of the applied system is that the floors and ceilings are completely finished in the production plant and delivered to the construction site with dismantled walls. The made the transport of 22 containers in two vehicles possible instead of 11 what it would take in the standard performance.

On this project, Konstruktor is engaged as a general contractor, according to the "turnkey" contract, for design and build of all architectural-construction works, thermotechnical, hydrotechnical and electrical installations, interior finishing works, as well as all landscaping works.

43.143575, 19.780079