项目介绍

After the successful realization of the Kalman project in 2013 the investor has continued the works in the Simanovci industrial zone by realizing a new warehouse facility of 3,000m2 surface. The facility was realized based on the turnkey system.

Design, licenses procurement and the construction together with the technical acceptance lasted less than 3 months, which enabled the investor to let the facility earlier than planned by the investment plan. In materializing the facility a combination of sandwich panels “Brucha” manufacturer, ALU facade and aluminum composite k-bond panels was successfully applied which gave the facility an aesthetic quality besides the utility value.

This is the 7th facility in row for Konstruktor where vibro-pressed concrete was applied for the treatment of traffic surfaces, proving it advantage over the asphalt. High load capacity, easy maintenance and the environmental feature (no bitumen) prevailed in opposition to the tradition of producing asphalt roads. Of course, the low price which represents a significant argument in making decisions which enable the saving for the investor.

On this project, Konstruktor is engaged as a general contractor, according to the "turnkey" contract, for design and build of all architectural-construction works, thermotechnical, hydrotechnical and electrical installations, interior finishing works, as well as all landscaping and traffic works of the complex.

44.871257, 20.108575